- Network Working Group A. Nicholson
- Request for Comments: 1306 J. Young
- Cray Research, Inc.
- March 1992
-
-
- Experiences Supporting By-Request Circuit-Switched T3 Networks
-
- Status of this Memo
-
- This RFC provides information for the Internet community. It does
- not specify an Internet standard. Distribution of this memo is
- unlimited.
-
- Abstract
-
- This memo describes the experiences of a project team at Cray
- Research, Inc., in implementing support for circuit-switched T3
- services. While the issues discussed may not be directly relevant to
- the research problems of the Internet, they may be interesting to a
- number of researchers and implementers.
-
- Developers at Cray Research, Inc. were presented with an opportunity
- to use a circuit-switched T3 network for wide area networking. They
- devised an architectural model for using this new resource. This
- involves activating the circuit-switched connection when an
- application program engages in a bulk data transfer, and releasing
- the connection when the transfer is complete.
-
- Three software implementations for this feature have been tested, and
- the results documented here. A variety of issues are involved, and
- further research is necessary. Network users are beginning to
- recognize the value of this service, and are planning to make use of
- by-request circuit-switched networks. A standard method of access
- will be needed to ensure interoperability among vendors of circuit-
- switched network support products.
-
- Acknowledgements
-
- The authors thank the T3 project team and other members of the
- Networking Group at Cray Research, Inc., for their efforts: Wayne
- Roiger, Gary Klesk, Joe Golio, John Renwick, Dave Borman and Craig
- Alesso.
-
-
-
-
-
-
-
-
- Nicholson & Young [Page 1]
-
- RFC 1306 Experiences with Circuit-Switched T3 March 1992
-
-
- Overview
-
- Users of wide-area networks often must make a compromise between low
- cost and high speed when accessing long haul connections. The high
- money cost of dedicated high speed connections makes them
- uneconomical for scientists and engineers with limited budgets. For
- many traditional applications this has not been a problem. Datasets
- can be maintained on the remote computer and results were presented
- in a text-only form where a low-speed connection would suffice.
- However, for visualization and other data transfer intensive
- applications, this limitation can severely impact the usability of
- high performance computing tools which are available only through
- long-haul network connections.
-
- Supercomputers are one such high performance tool. Many users who
- can benefit from access to supercomputers are limited by slow network
- connections to a centrally located supercomputer. A solution to this
- problem is to use a circuit-switched network to provide high speed
- network connectivity at a reduced cost by allocating the network only
- when it is needed.
-
- Consider how a researcher using a visualization application might
- efficiently use a dedicated low speed link and a circuit switched
- high speed link. The researcher logs in to the remote supercomputer
- over the low speed link. After running whatever programs are
- necessary to prepare the visualization, the high speed connection is
- activated and used to transfer the graphics data to the researcher's
- workstation.
-
- We built and demonstrated this capability in September, 1990, at the
- Telecommunications Association show in San Diego, using this type of
- visualization application. Further, it will be available in a
- forthcoming release of our system software.
-
- Architectural Model
-
- We developed our support for circuit switched services around a
- simple model of a switched network. At some point in the path
- between two hosts, there is a switched network connection. This
- connection is likely to connect two enterprise networks operated by
- the same organization. Administrative overlap between the two
- networks is useful for accounting and configuration purposes. We
- believe that with further investigation circuit switched network
- support could be extended to multiple switched links in an internet
- environment.
-
- The switch which makes the network connection operates on a "by-
- request" basis (also called "on-demand"). When it receives a request
-
-
-
- Nicholson & Young [Page 2]
-
- RFC 1306 Experiences with Circuit-Switched T3 March 1992
-
-
- to make a network connection it will do so (if possible), and breaks
- the connection when requested. The switch will not activate
- automatically if there is an attempt to transfer data over an
- incomplete connection.
-
- We also made the assumption that the circuit would be switched on a
- connection basis rather than a packet basis. When an application
- begins sending data utilizing the switched connection, it will send
- all the data it has, without stopping, until it is finished. At this
- time it will release the connection. It is assumed that the quantity
- of data will be large enough that the circuit setup time is
- negligible relative to the period of the transfer. Otherwise, it is
- not worth the effort to support the circuit switched network for
- small data transfers.
-
- This model requires that just before the application begins a large
- bulk transfer of data, a request message is sent to the switch asking
- that the switched network connection be activated. Once the link is
- up, the application begins sending data, and the network routes all
- the data from the application through the switched network. As soon
- as all the data has been sent, a message is sent to the switch to
- turn off the switched link, and the network returns to routing data
- through the slower link.
-
- The prototype system we built for the TCA show was designed around
- this model of circuit switched services. We connected a FDDI
- backbone at Cray Research in Eagan, Minnesota to the TCA show's FDDI
- network through 2 NSC 703 FDDI/T1/T3 routers. MCI provided a
- dedicated T1 line and a switched T3 line, using a DSC DS3 T3 switch
- located in Dallas, Texas. These networks provided connectivity
- between a Cray Research computer in Eagan to a Sun workstation on the
- show floor in San Diego.
-
- Alternative Solution Strategies
-
- The first aspect of using the switched services involved the circuit
- switch. The DS3 switch available to us was accessed via a dial up
- modem, and it communicated using a subset of the CCITT Q.295
- protocol. Activating the switch required a 4 message exchange and
- deactivation required a 3 message exchange. We felt the protocol was
- awkward and might be different for other switch hardware.
- Furthermore, we believed that the dial up aspect of communicating
- with the switch suffered from the same drawbacks. A good solution
- would require a cleaner method of controlling the switch from the
- source host requesting the switched line.
-
- The next aspect of using switched services involves the source host
- software which requests and releases the switched network. Ideally,
-
-
-
- Nicholson & Young [Page 3]
-
- RFC 1306 Experiences with Circuit-Switched T3 March 1992
-
-
- the switched network is activated just before data transfer takes
- place and it is released as soon as all data has been sent. We
- considered using special utility programs which a user could execute
- to control the link, special system libraries which application
- programs could call, or building the capability into the kernel. We
- also considered the possibility that these methods could send
- messages to a daemon running on the source host which would then
- communicate with another entity actually controlling the switch.
-
- The last aspect of using switched services we considered is selection
- of the switch controlled network. This involves both policy issues
- and routing issues. Policy issues include which users running which
- applications will be able to use higher cost switched links. And
- packets must be routed amongst multiple connections offering varying
- levels of service after they leave their source.
-
- Implementations
-
- We have developed a model for switch control through the internetwork
- which we believe to be reasonable. However, we have experimented
- with three different source host implementations. These different
- implementations are detailed here.
-
- Switch control
-
- Our simplest design decisions involved the switch itself. We decided
- that the complex protocol and dial up line must be hidden from the
- source host requesting the switched link. We decided that the source
- host would use a simple request/release protocol with messages sent
- through the regular network (as opposed to dial up lines or other
- connections). Some host accessible through the local network would
- run a program translating the simple request and release messages
- into the more complicated switch protocol and also have the modem to
- handle the dial up connection.
-
- This has a variety of advantages. First, it isolates differences in
- switch hardware. Second, multiple hosts may access the switch
- without requiring multiple modems for the dial up line. And it
- provides a central point of control for switch access. We did not
- consider any alternatives to this model of switch control.
-
- Our initial implementation used a simple translator daemon running on
- a Sun workstation. Listening on a raw IP port, this program would
- wait for switch control messages. Upon receipt of such a message, it
- would dial up the switch and attempt to handle the request. It would
- then send back a success or failure response. This host, in
- conjunction with the translator daemon software, is referred to as
- the switch controller. The switch controller we used was local to
-
-
-
- Nicholson & Young [Page 4]
-
- RFC 1306 Experiences with Circuit-Switched T3 March 1992
-
-
- our enterprise network; however, it could reside anywhere in the
- Internet.
-
- Later we designed a simple protocol for switch control, which was
- implemented in the translator daemon. This protocol is documented in
- RFC 1307, "Dynamically Switched Link Control Protocol".
-
- Source Control of the Switched Link
-
- This problem involves a decision regarding what entity on the source
- host will issue the switch request and release messages to the switch
- controller, and when those messages will be issued. Because we do
- not have very much field experience with this service, we do not feel
- that it is appropriate to recommend one method over the others. They
- all have advantages and disadvantages.
-
- What we did do is make 3 different implementations of the request
- software and can report our experiences with each. These are one set
- of special utility programs which communicate with the switch
- controller, and 2 kernel implementations. We did not experiment with
- special libraries, nor did we implement a daemon for switch control
- messages on the source host.
-
- Switch control user programs
-
- This implementation of source host control of the switch is the
- simplest. Two programs were written which would communicate requests
- to the switch controller; one for activating the connection, and
- another to deactivate the connection. The applications using this
- feature were then put into shell scripts with the switch control
- programs for simple execution.
-
- This approach has the significant advantage of not requiring any
- kernel modifications to any machine. Furthermore, application
- programs do not need to be modified to access this feature. And
- access to the circuit-switched links can be controlled using the
- access permissions for the switch-control programs.
-
- However, there are disadvantages as well. First, there is
- significant potential for the switch to be active (and billing the
- user) for the dead time while the application program is doing tasks
- other than transferring bulk data. The granularity of turning the
- switch on and off is limited to a per-application basis.
-
- Another disadvantage is that most applications use only the
- destination host's address for transfer, and this is the only
- information available to the transport and network layers for routing
- data packets. Some other method must be used to distinguish between
-
-
-
- Nicholson & Young [Page 5]
-
- RFC 1306 Experiences with Circuit-Switched T3 March 1992
-
-
- traffic which should use the circuit-switched connection and lower-
- priority traffic. This problem can be addressed using route aliases,
- described below.
-
- Kernel switch control
-
- We have made two different implementations of switch control
- facilities within the operating system kernel. Both rely upon the
- routing lookup code in the kernel to send switch connect and tear
- down messages. The difference is in how the time delay between
- request of the switch and a response is handled.
-
- For starters, routing table entries were expanded to include the
- internet address of the switch controller and state information for
- the switched connection. If there is a switch controller address
- specified, then the connection must be set up before packets may be
- sent on this route. We also added a separate module to handle the
- sending and receiving of the switch control messages.
-
- When a routing lookup is satisfied, the routing code would check
- whether the routing table entry specified a switch controller. If
- so, then the routine requesting switch setup would be called. This
- would send a message on the Internet to the switch controller to
- setup the connection.
-
- In our first implementation, the routing lookup call would return
- immediately after sending the switch connection request message. It
- would be the responsibility of the transport protocol to deal with
- the time delay while the connection is setup, and to tear down if the
- switched connection could not be made. This has significant
- ramifications. In the case of UDP and IP, packets must be buffered
- for later transmission or face almost certain extermination as they
- will probably start arriving at the switched connection before it is
- ready to carry traffic. Because of this problem, we decided that
- this feature would not be available for UDP or IP traffic.
-
- We did make this work for TCP. Since TCP is already designed to work
- so that it buffers all data for possible later retransmission, this
- was not a problem. Our first cut was to change TCP to check that the
- route it was using was up if it is a switch controlled route. TCP
- would not send any data until the route was complete, and it would
- close the connection if the switch did not come up.
-
- This did not work well at first because every time TCP tried to send
- data before the switch came up, the retransmit time would be reset
- and backed off. The rtt estimate, retransmit timeouts and the
- congestion control mechanism were seriously skewed before any data
- was ever sent. The retransmit timer would expire as many as 3 times
-
-
-
- Nicholson & Young [Page 6]
-
- RFC 1306 Experiences with Circuit-Switched T3 March 1992
-
-
- before data could be transmitted. We solved this problem by adding
- another timer for handling the delay while the route came up, and not
- allowing the delay to affect any of the normal rtt timers.
-
- Our experiences with this approach were not particularly positive,
- and we decided to try another. We also felt that unreliable datagram
- protocols should be able to use the service without excessive
- reworking. Our alternative still sends the switch control message
- when a routing lookup finds a controlled route. However, we now
- suspend execution of the thread of control until a response comes
- back from the switch controller.
-
- This proved to be easier to implement in many ways. However, there
- were two major areas requiring changes outside the routing code.
- First, we decided that if the switch refused to activate the
- connection, it was pointless to try again. So we changed the routing
- lookup interface so that it could return an error specifying a
- permanent error condition. The transport layer could then return an
- appropriate error such as a host unreachable condition.
-
- The other, more complex issue deals with the suspension of the thread
- of execution. Our operating system, UNICOS, is an ATT System V
- derivative, and our networking subsystem is based on the BSD tahoe
- and reno releases. The only way to suspend execution is to sleep.
- This is fine, as long as there is a user context to put to sleep.
- However, it is not a good idea to go to sleep when processing network
- interrupts, as when forwarding a packet.
-
- We solved this problem by using a global flag regarding whether it
- was ok for the switch control message code to sleep. If it is
- necessary to send a message and sleep, then the flag must be set and
- an error is returned if sleeping is not allowed. User system calls
- which might cause a switch control message to be sent set and clear
- the flag upon entrance and exit. We also made it impossible to
- forward packets on a switch controlled route. We feel that this is
- reasonable since the overhead of switch control should be incurred
- only when an application program has made an explicit request to
- begin transfer of data.
-
- The one other change we made was to make sure that TCP freed the
- route it is using upon entering TIME_WAIT state. There is no point
- in holding the circuit open for two minutes in case we need to
- retransmit the final ack. Of course, this assumes that an alternate
- path exists for the the peer to retransmit its fin.
-
- The advantage of building this facility into the kernel is that it
- allows a fine degree of control over when the switch will and will
- not need to be activated. Many applications which open a data
-
-
-
- Nicholson & Young [Page 7]
-
- RFC 1306 Experiences with Circuit-Switched T3 March 1992
-
-
- connection, transmit their bulk data, and then close the connection
- will not require modifications and will make efficient use of the
- resource. It also opens the possibility that applications written to
- use type-of-service can use the same network connection for low-
- bandwidth interactive traffic, change the type-of-service (thus
- activating the switched connection) for bulk transfers, and then
- release the switch upon returning to interactive traffic.
-
- Putting this feature into the kernel also allows strong control over
- when and how the switched link can be used, keeping accounting
- information, and limiting multiple use access to the switched link.
-
- The disadvantage is that significant kernel modifications are
- required, and some implementation details can be very difficult to
- handle.
-
- Switch control libraries
-
- The switch control programs we used were built on a library of simple
- switch control routines; however, we did not alter any standard
- applications to use this library. We did consider some advantages
- and disadvantages. On the plus side, it is possible to achieve a
- satisfactory degree of switch control without requiring any kernel
- modifications.
-
- The primary disadvantage of this approach is that all applications
- must be altered and recompiled. This is particularly inconvenient
- when source is not available.
-
- Link Selection
-
- When an application wishes to send data over a circuit-switched
- connection, it will be necessary to select the switched link over
- other links. This selection process may need to take place many
- times, depending on the local network between the source host and the
- bridge to the circuit switched connection.
-
- For example, if the kernel routing code is controlling the link, then
- there must be a way to choose a controlled route over another route.
- Further downstream, there must be a way to route packets to the
- switched link rather than other links.
-
- This issue has the potential for great complexity, and we avoided as
- much of the complexity as possible. Policy routing and local routing
- across multiple connections are fertile areas for work and it is
- outside the scope of this work to address those issues. Instead we
- opted for simple answers to difficult questions.
-
-
-
-
- Nicholson & Young [Page 8]
-
- RFC 1306 Experiences with Circuit-Switched T3 March 1992
-
-
- First of all, we added no special policies to link accessibility
- beyond that already found in UNICOS. And we handled local routing
- issues to the NSC FDDI/T1/T3 routers with routing table manipulation
- and IP Type-of-Service.
-
- We came up with three solutions for selecting a routing table entry.
- The first possibility is to use the type-of-service bits, which
- seemed natural to us. We changed the routing table to include type-
- of-service values associated with routing entries, and the routing
- lookups would select using the type-of-service. UNICOS already
- supports a facility to mark connections with a type-of-service value.
- A controlled route could be marked with high throughput type-of-
- service and an application wishing to transfer bulk data could set
- the socket for high throughput before making the connection. It
- could also be possible to change the type-of-service on an existing
- connection and start using the switched link if one is available.
-
- Using the type-of-service bits have the advantage that downstream
- routers can also use this information. In our demonstration system,
- the NSC FDDI/T1/T3 routers were configured to transfer packets with
- high throughput type-of-service over the T3 connection and all others
- over the T1 connection.
-
- Another possibility is to take advantage of the multiple addresses of
- a multi-homed host. Routing tables could be set up so that packets
- for one of the addresses get special treatment by traveling over the
- switched link. The routing table in the source host would have an
- entry for accessing the switch controller when sending to the high
- throughput destination address.
-
- We also derived a method we call route aliasing. Route aliasing
- involves associating extra addresses to a single host. However,
- rather than the destination being an actual multi-homed host, the
- alias is known only to the source host and is used as an alternative
- lookup key. When an application tries to connect to the alias
- address the routing lookup returns an aliased route. The route alias
- contains the actual address of the host, but because of looking up
- the special address, the switch is activated. The alias could also
- specify a type-of-service value to send in the packets so that
- downstream routers could properly route the packets to the switched
- link. We realize that some may bemoan the waste of the limited
- Internet address space for aliases; however, only the source host is
- aware of the alias, and the primary shortage is with Internet network
- addresses rather than host addresses. In fact, we argue that this is
- a more efficient use of the already sparse allocation of host
- addresses available with each network address.
-
-
-
-
-
- Nicholson & Young [Page 9]
-
- RFC 1306 Experiences with Circuit-Switched T3 March 1992
-
-
- Future considerations
-
- We believe that by-request services will become increasingly
- important to certain classes of users. Many data centers make high
- performance resources available over a wide area, and these will be
- the first users to take advantage of wide-area circuit-switched
- networks. Some users, such as CICNet ([2]), are already interested
- in deploying this capability and telecom vendors are working to
- satisfy this need. However, there are a lot of issues involved in
- providing this functionality. We are working to involve others in
- this process.
-
- References
-
- [1] Nicholson, et. al., "High Speed Networking at Cray Research",
- Computer Communications Review, January 1991.
-
- [2] CICNet DS3 Working Group, "High Performance Applications on
- CICNet: Impact on Design and Capacity", public report, CICNet,
- Inc., June 1991.
-
- [3] Young, J., and A. Nicholson, "Dynamically Switched Link Control
- Protocol", RFC 1307, Cray Research, Inc., March 1992.
-
- Security Considerations
-
- Security issues are not discussed in this memo.
-
- Authors' Addresses
-
- Andy Nicholson
- Cray Research, Inc.
- 655F Lone Oak Drive
- Eagan, MN 55123
-
- Phone: (612) 452-6650
- EMail: droid@cray.com
-
-
- Jeff Young
- Cray Research, Inc.
- 655F Lone Oak Drive
- Eagan, MN 55123
-
- Phone: (612) 452-6650
- EMail: jsy@cray.com
-
-
-
-
-